Master Bathroom Remodel Weekend Number 20
+Sylvia Wormley and I worked on a floor plan this morning. I am sure it will change, but here it is.
I finally got all of the walls demolished in the master bathroom.
On one of my trips in the attic today I noticed that the vent pipe for the Jack and Jill bathroom was drooping. Upon further inspection I found that the original contractor had the vent piping supported by a single nail. The rooking contractors had knocked it loos when they installed a replacement bathroom fan. I refitted the pipe, which was unglued and put a temporary wire to support the pipe until I could make a permanent repair.
I finally got all of the walls demolished in the master bathroom.
I am going to have to do some ceiling sheet rock work |
I am going to have to do some ceiling sheet rock work. This hole is above the shower. |
I am going to have to do some ceiling sheet rock work. This hole is above the shower. |
Master bedroom is on the left. Small stub wall is dead center. This wall may come out. It currently has the water over flow pipe and a cold water supply to the kitchen. |
Wall with insulation has the living room on the other side. The old shower was here. |
Wall with insulation has the living room on the other side. The moldy plywood flooring will be replaced.. |
The support nail is on the left next to the elbow. |
The elbow at the right was lose at the horizontal pipe. |
I added a wire to support the pipe to prevent it from coming apart. I will get some wire tape and make a permanent support. |
Comments
Post a Comment